Canon Ir Adv C5550i User Manual
- Canon Imagerunner Advance C5550i Manual
- Canon Ir Adv C5550i Manual
- Canon Imagerunner Advance C5550i User Manual
You can print, zoom or read any diagram, picture or page from this Service Manual. Every chapter on this manual is fully detailed and contain all the simulation codes, trouble codes, maintenance procedures, reset procedures, diagnose procedures of Canon iR Advance C5560i iR Advance C5550i iR Advance C5540i iR Advance C5535i photocopier.
Service Manual Canon imageRUNNER Advance C5560i imageRUNNER Advance C5550i imageRUNNER Advance C5540i imageRUNNER Advance C5535i;
This manual is in the PDF format and have detailed Diagrams, pictures and full procedures to diagnose and repair your Canon imageRUNNER Advance copier.
You can print, zoom or read any diagram, picture or page from this Service Manual. Every chapter on this manual is fully detailed and contain all the simulation codes, trouble codes, maintenance procedures, reset procedures, diagnose procedures of Canon iR Advance C5560i iR Advance C5550i iR Advance C5540i iR Advance C5535i photocopier. You can find easily everything what do you need.
To see what contain, please read table of contents:
SAFETY PRECAUTIONS
Laser Safety
Handling of Laser System
Turn power switch ON
Power Supply
Toner Safety
About Toner
Handling Adhered Toner
Notes When Handling a Lithium Battery
Notes Before it Works Serving
Points to Note at Cleaning
Notes on Assembly/Disassembly
- We use cookies to provide you with the best possible experience in your interactions with Canon and on our website – find out more about our use of Cookies and change your cookie settings here. You agree to our use of cookies on your device by continuing to use our website or by clicking I Accept.
- ImageRUNNER ADVANCE C5550i Add to wish list Overview Features Specifications.
- Canon u.s.a.,inc. Shall not be held liable for errors contained herein, or for lost profits, lost opportunities, consequential or incidental damages incurred as a result of acting on information, or the operation of any software, included in this software site.
1. PRODUCT OVERVIEW
Product Lineup
Host machine
Options
Features
Product Features
Toner Container
Setup Guide
Introduction of Situation Mode
Limiting of Color Printing
Specifications
Product Specifications
Weight and Size
Productivity
Paper type
Parts Name
External View
Cross Section View
Control Panel
Arris surfboard sbg7580-ac user manual. ARRIS Enterprises, LLC, 3871 Lakefield Drive, Suwanee, GA 30024, declares that the SURFboard DOCSIS 3.0 Wireless Gateway-SBG7580-AC complies with 47 CFR.
2. TECHNOLOGY
Basic Configuration
Functional Configuration
Original Exposure System
Overview
Magnification Ratio
Original Size Detection
Dust Detection Control
Image Processing
Color displacement correction processing in vertical scanning direction
Outline of Electric Circuits
Scanner Unit
Pickup Feed System
Fan
Power Supply Assembly
Controller System
Specifications / Configuration
Motion Sensor
Shutdown Sequence
Startup Sequence
Laser Exposure System
Overview
Laser ON/OFF Control
Horizontal Scanning Synchronization Control
Vertical Scanning Synchronization Control
APC (Auto Power Control)
Laser Scanner Motor Control
BD Correction Control
Laser Shutter Control
Image Skew Correction Control
Image Formation System
Overview
Charging Control
Developing Control
Primary Transfer Control
Secondary Transfer Control
Pre-exposure Control
Image Stabilization Control
Toner Supply Control
Waste Toner Feed Control
Other Controls
Fixing System
Overview
Overview of Fixing Temperature Control
Standby temperature control
Print temperature control
Down sequence control
Fixing Film Edge Cooling Control
Film Unit Engagement/Disengagement Control
Fixing Unit Detection
Detection of New Fixing Film Unit
Protection function
Pickup Feed System
Overview
Cassette Pickup Assembly
Multi-Purpose Tray Pickup Assembly
Fixing/Registration Assembly
Duplex / Delivery Assembly
Jam Detection
External Auxiliary System
Counter Control
Fan Control
Environment Heater Control
Power Supply
Power-saving Function
Quick Startup
3. PERIODICAL SERVICE
Consumable Parts List
Host machine
Cassette Feeding Unit-AM1
High Capacity Cassette Feeding Unit-A1
Paper Deck Unit-F1
Booklet Finisher-Y1
Staple Finisher-Y1
Inner Finisher-H1
Cleaning/Check/Adjustment Locations
Compatibility of Consumable Parts
4. DOSASSEMBLY/ASSEMBLY
Preface
Outline
List of Parts
List of Cover
List of Electrical Parts
List of Connectors
Original Exposure System
Removing the ADF Pre-separation Unit / ADF Separation Roller
Removing the ADF Pickup Roller Unit
Removing the ADF Pickup Roller and the ADF Feed Roller
Installing the ADF Pickup Roller Unit
Removing the ADF
Installing the White Plate
Removing the ADF Scanner Unit
Cleaning the Paper Back Reading Glass
Removing the Rear Cover
Cleaning the Lead Roller 1/2/3
Removing the ADF Driver PCB
Removing the Reader Controller PCB
Cleaning the Reader Scanner Unit Scanner Mirror
Removing the Reader Scanner Unit
Main Controller System
Removing the HDD
Removing the Main Controller PCB
Removing the Riser PCB
Opening the Controller Box
Removing the DC Controller PCB
Removing the Primary Transfer/Bk Developing Charging High-Voltage Unit
Removing the Rear Lower Cover
Removing the Power Supply Unit (12 V/24 V)
Removing the Feed/Drum Driver PCB
Removing the Relay PCB
Removing the Secondary Transfer High Voltage Unit
Removing the AC Driver PCB
Removing the Control Panel
Removing the All-night Power Supply PCB
Removing the Developing High-Voltage PCB (YMC)/Charging High-Voltage PCB (YMC)
Laser Control System
Cleaning the Dustproof Glass
Removing the Dustproof Glass Cleaning Pad
Removing the Laser Scanner Unit
Image Formation System
Removing the Toner Filter
Removing the ITB Unit
Cleaning the Registration Patch Sensor
Removing the Registration Patch Sensor (Front), (Middle), (Rear)
Removing the ITB Cleaning Unit
Removing the ITB Cleaning Blade Unit
Installing the ITB Cleaning Blade Unit
Removing the ITB
Removing the Primary Transfer Roller (Bk)
Removing the Primary Transfer Roller (C, M, Y)
Removing the Secondary Transfer Inner Roller
Installing the ITB
Removing the Waste Toner Container
Pulling out the Process Unit
Removing the Process Unit
Installing the Process Unit
Removing the Drum Unit
Installing the Drum Unit
Removing the Developing Unit
Installing a New Developing Unit
Removing the Waste Toner Feed Unit
Removing the Secondary Transfer Roller/Secondary Transfer Separation Guide Unit
Installing the Secondary Transfer Roller/Secondary Transfer Separation Guide Unit
Removing the Main Drive Unit
Removing the Toner Container Front Inner Cover
Removing the Hopper Unit (M)
Removing the Hopper Unit (Y)
Removing the Hopper Unit (C)
Removing the Hopper Unit (Bk)
Fixing System
Removing the Fixing Unit
Removing the Film Unit
Cleaning the Fixing Shutter Cover
Cleaning the Fixing Separation Guide
Cleaning the Fixing Inlet Guide
Removing the Pressure Roller and Pressure Roller Bearing
Removing the 27T Gear
Pickup Feed System
Cleaning the Secondary Transfer Guide
Cleaning the Feed Contact Guide
Cleaning the Registration Roller
Cleaning the Pre-registration Guide Unit
Cleaning the Registration Sensor
Cleaning the Between-Cassette 1/2 Sensor
Cleaning the Fixing Delivery Guide
Cleaning the Fixing Rear Roller
Cleaning the Fixing Delivery Roller
Removing the Duplex Feed Upper Rollers
Removing the Duplex Feed Lower Roller
Cleaning the Second/Third Delivery Roller, Roller and First, Second, and Third Delivery Rollers
Removing the Right Rear Cover 1
Removing the Front Right Cover
Removing the Reverse Backend Guide and Inner Output Cover
Removing the Second/Third Delivery Unit
Removing the First Delivery Unit
Removing the Duplex Unit
Removing the Multi-purpose Tray/Feed/Separation Roller
Removing the Pickup/Delivery/Separation Roller (Cassette 1/2)
Removing the Right Door
Removing the Cassette 1/2 Pickup Unit
Removing the Transparency Sensor/Registration Sensor
5. ADJUSTMENT
Pickup Feed System
Image Position Adjustment
Geometric Characteristics Adjustment
Original Exposure System
Reader Assembly
ADF
Actions at Parts Replacement
MP Pickup Tray Unit
DC Controller PCB
Control Panel CPU PCB
Hard disk
Laser Scanner Unit
ITB Unit
ITB
Secondary Transfer Inner Roller
Secondary Transfer Roller
Drum Unit
Developing Unit
Patch Sensor
Reader Controller PCB
Scanner Unit (Paper Front)
Scanner Unit (Paper Back)
Copyboard Glass
6. TROUBLESHOOTING
Initial Check
Test Print
Overview
How to use the test print
Troubleshooting Items
Fixing Wrinkle/Jams Caused by Deterioration in the Rib of the Fixing Inlet Guide
Display of “Non-Canon Product” Message
Forcible stop of paper feed
Controller Self Diagnosis
Preface
Overview
Basic Flowchart
Boot Method
Diagnosis Result
Limitations
Debug Log
Overview
Saving to a USB device using download mode (Method 1)
Saving to a USB Device with Counter Key + Numeric Key (Methods 2 and 4)
Saving to a PC Using SST (Method 3)
Saving to a USB Flash Drive Using Service Mode (Method 5)
Service Mode Relating to Debug Logs
Collecting the Log of Key Operations
Network Packet Capture
Canon Imagerunner Advance C5550i Manual
7. ERROR/JAM/ALARM
Overview
Location Code
Pickup Position Code
Pickup size
Points to Note When Clearing MN-CON
Points to Note When Clearing HDD
Error Code
Error Code Details
Jam Code
Jam Type
Jam screen display specification
Main Unit
ADF/ Reader
Cassette Feeding Unit-AM1
High Capacity Cassette Feeding Unit-A1
Paper Deck Unit-F1
Inner Finisher-H1
Staple Finisher-Y1/ Booklet Finisher-Y1
2/4 Hole Puncher Unit-A1
Inner 2/4 Hole Puncher-B1
Buffer Pass Unit-L1
Alarm Code
Alarm Code Details
8. SERVICE MODE
Overview
Points to Note when Executing Service Mode
Service Mode Menu
Description of Service Mode Items
Operation Check of Electrical Components
Enhanced I/O Information
Security Support
Switching the Screen Display (Level 1 <->2)
Service Mode Backup
Output of Service Print Data
SITUATION Mode
Function to Mask the Screen during Remote Access
COPIER
DISPLAY
I/O
ADJUST
FUNCTION
OPTION
TEST
COUNTER
FEEDER
DISPLAY
ADJUST
FUNCTION
OPTION
SORTER
ADJUST
FUNCTION
OPTION
BOARD
OPTION
Canon Ir Adv C5550i Manual
9. INSTALLATION
How to Check this Installation Procedure
Symbols
Points to Note at Installation
Checking before Installation
Checking Power Supply
Checking the Installation Environment
Checking the Installation Space
Points to Note before Installation
Combination Table of Accessory Installation
Unpacking
Checking the Contents
Installation Procedure
Removing the Packaging Materials
Installing the Scanner
Installing the Drum Unit
Setting the Environment Heater Switch
Installing IC Card Reader (EUR Only)
Setting the Cassette
Installing Stamp Cartridge
Installing the Cleaning Tool
Securing the Host Machine
Turning the Main Power ON / Setting the Toner Container
Host Machine Settings (Starting the Setup Guide)
Other Installations
Installing the Envelope Attachment
Checking after the Installation
Auto Adjust Gradation
Register Correction Pattern
Execute the ITB Equilibrium Position Detection
Adjusting Image Position
Checking Network Connection
Troubleshooting of Network
Printer Cover-J1
Points to Note before Installation
Checking the Contents
Check Items when Turning OFF the Main Power
Installation Outline Drawing
Installation Procedure
Platen Cover Type W
Checking the Contents
Check Item When Turning OFF the Main Power
Installation Outline Drawing
Installation Procedure
NFC Kit-B1 (Flat Control Panel)
Points to Note before Installation
Checking the Contents
Check Item When Turning OFF the Main Power
Installation Outline Drawing
Installation procedure
Setting after Installation
Reader Heater Unit – J1
Checking the Contents
Check Item When Turning OFF the Main Power
Installation Outline Drawing
Installation Procedure
Paper Deck Heater Unit-C1
Checking before Installation
Checking the Contents
Installation Procedure
Checking after Installation
Inner 2-Way Tray-J1
Checking the Contents
Check Item When Turning OFF the Main Power
Installation Outline Drawing
Installation Procedure
Settings after Installation
Copy Tray-J2
Checking the Contents
Check Item When Turning OFF the Main Power
Installation Outline Drawing
Preparation before Installation
Installation Procedure
Settings after installation
Utility Tray-B1
Points to Note when Installing
Checking the Contents
Installation Outline Drawing
Installation Procedure
When Installing the USB Keyboard
Copy Card Reader-F1/Copy Card Reader Attachment-B5
Points to Note when Installing
Checking the Contents
Check Items when Turning OFF the Main Power
Installation Outline Drawing
Installation
Checking after Installation
IC Card Reader Box-C1
Points to Note when Installing
Check Items when Turning OFF the Main Power
Installation Outline Drawing
Checking the Contents
Installation Procedure
Serial Interface Kit-K3, Copy Control Interface Kit-A1
Points to Note at Installation
Checking the Contents
Check Items When Turning OFF the Main Power
Installation Outline Drawing
Installation Procedure
Document Scan Lock Kit-B1
Points to Note at Installation
Checking the Contents
Check Items When Turning OFF the Main Power
Installation Outline Drawing
Installation Procedure
Checking after Installation
Voice Operation Kit-D1
Points to Note at Installation
Checking the Contents
Check Items When Turning OFF the Main Power
Installation Outline Drawing
Installation Procedure
Checking after Installation
Operation Check
Pre-checks for HDD-related Option
Points to Note at Installation
Installation Outline Drawing
Check Item When Turning OFF the Main Power
Removing the HDD (Preparation)
[TYPE-1] Option HDD (1TB)
Checking the Contents
Check Item When Turning OFF the Main Power
Installation Procedure
[TYPE-2] Removable HDD Kit
Checking the Contents
Check Item When Turning OFF the Main Power
Installation Procedure
[TYPE-3] Option HDD (1TB) + Removable HDD Kit
Checking the Contents
Check Item When Turning OFF the Main Power
Installation Procedure
[TYPE-4] Standard HDD + Option HDD (250GB) + HDD Mirroring Kit
Checking the Contents
Check Item When Turning OFF the Main Power
Installation Procedure
[TYPE-5] Standard HDD + Option HDD (250GB) + Removable HDD Kit + HDD Mirroring Kit
Checking the Contents
Check Item When Turning OFF the Main Power
Installation Procedure
[TYPE-6] 2 Option HDDs (1TB) + HDD Mirroring Kit
Checking the Contents
Check Item When Turning OFF the Main Power
Installation Procedure
[TYPE-7] 2 Option HDDs (1TB) + Removable HDD Kit + HDD Mirroring Kit
Checking the Contents
Check Item When Turning OFF the Main Power
Installation Procedure
Voice Guidance Kit-G1
Points to Note at Installation
Checking the Contents
Check Items when Turning OFF the Main Power
Installation Outline Drawing
Installation Procedure
Checking after Installation
Operation Check Opera mini browser download for jio phone.
APPENDICES
Service Tool
List of Special Tools
Solvent/Oil List
General Circuit Diagram
Main Unit General Circuit Diagram
Control Panel Unit General Circuit Diagram
ADF/Reader General Circuit Diagram
Backup Data
Detail of HDD partition
Software Counter Specifications
Removal
Overview
Work Procedure
Target PCBs of Automatic Update
List of Service Modes That Can Be Restored
Canon Imagerunner Advance C5550i User Manual
Number of pages: 1331.
iRA C5560i iRA C5550i iRA C5540i iRA C5535i iRAC5560i iRAC5550i iRAC5540i iRAC5535i